How to Prepare an RFQ for a Multi-Process Custom Manufacturing Project
Preparing a clear Request for Quotation (RFQ) is an important first step in any custom manufacturing project. When a project involves multiple processes, such as CNC machining, sheet metal fabrication, and injection molding, the RFQ needs to include more than just drawings and estimated quantities.
A complete RFQ package helps manufacturers understand each part, identify the required production processes, check technical requirements, and prepare a more accurate quotation. It also reduces repeated questions and delays during the quotation process.
For companies sourcing custom parts from an OEM parts supplier in China, here is how to prepare an RFQ for a multi-process manufacturing project.
1. Prepare the Correct CAD Files and Engineering Drawings
The first step is to provide the latest design files for every part in the project.
3D CAD files help manufacturers understand the part's geometry, structure, and features. 2D engineering drawings provide the dimensions, tolerances, material specifications, and other technical requirements needed for production and inspection.
Common file formats include:
- 3D CAD files: STEP, STP, IGES, or native CAD formats.
- 2D drawings: PDF or other clearly readable engineering drawing formats.
For each part, it is best to provide both a 3D model and a 2D drawing whenever available.
Before sending the files, check that:
- The 3D model matches the latest 2D drawing.
- All dimensions and tolerances are readable.
- Important features and critical dimensions are clearly identified.
- The drawing revision is clearly marked.
- The files represent the same approved design version.
If the project has gone through several design revisions, make sure outdated files are not mixed with the current version. Clear revision control helps prevent manufacturers from quoting or producing parts based on incorrect information.
2. Create a Clear Bill of Materials (BOM)
When a project contains multiple custom parts, a Bill of Materials (BOM) helps organize the information.
A BOM provides a list of all parts included in the project. It allows the manufacturer to identify each component, understand its quantity, and match it with the corresponding drawing and production requirements.
A useful BOM should include:
- Part number
- Part name or description
- Drawing number and revision
- Required quantity
- Material
- Manufacturing process
- Surface finish or secondary treatment, if applicable
- Special notes, if any
For example, a product assembly may include CNC-machined aluminum components, sheet metal brackets, and injection-molded plastic housings.
Each component should have a unique part number. The same part number should appear in the BOM, drawing file, and quotation request.
This makes it easier to match each part with its technical requirements and reduces confusion when several components have similar names or appearances.
3. Identify the Manufacturing Process for Each Part
A multi-process project may involve several manufacturing methods. Do not assume that the manufacturer can identify your preferred process from the drawings alone.
Clearly indicate the required or preferred manufacturing process for each part in the BOM or a separate process list.
Common examples include:
- CNC machining: For precision metal or plastic components with detailed features and dimensional requirements.
- Sheet metal fabrication: For brackets, panels, enclosures, and formed metal components.
- Injection molding: For plastic housings, covers, and other components intended for molded production.
If you are unsure which process is most suitable, you can describe the part's function, material, expected quantity, and performance requirements. The manufacturer can then review the manufacturing requirements and provide feedback on process feasibility.
For projects involving several processes, also clarify whether the parts need to be supplied individually or delivered as a complete assembly.
This information helps the manufacturer understand the full project scope rather than quoting each part without considering how the components fit together.
4. Specify Materials, Tolerances, and Surface Finishing
Technical requirements have a direct impact on manufacturing methods, production costs, and lead times. They should be clearly stated in the RFQ.
Material specifications
List the required material for each part. Avoid using general descriptions when a specific grade is available.
For example:
- Aluminum: 6061-T6 or 7075-T6
- Stainless steel: 304 or 316L
- Titanium: Ti-6Al-4V
- Plastic: POM, ABS, PC, or PA
If a specific material grade, standard, or condition is required, include it in the drawing or RFQ notes.
If alternative materials are acceptable, state this clearly and indicate whether the manufacturer may propose alternatives for your review.
Dimensional tolerances
General tolerances and critical tolerances should be distinguished.
You do not need to apply very tight tolerances to every dimension. Instead, identify the dimensions that are important for assembly, function, or performance.
Make sure that:
- Critical dimensions are clearly marked.
- General tolerance standards are specified where applicable.
- Geometric tolerances are included when required.
- Important fit and interface dimensions are easy to identify.
Clear tolerance requirements help manufacturers evaluate machining difficulty and inspection needs before preparing a quotation.
Surface finishing and secondary processes
Surface requirements should also be specified for each part.
Depending on the material and application, these may include:
- Anodizing
- Powder coating
- Plating
- Passivation
- Bead blasting
- Polishing
- Painting
If the surface treatment needs to meet a specific color, thickness, appearance, or standard, include the relevant details.
For parts with different surface requirements on different areas, mark these areas clearly on the drawing.
5. Define Inspection and Quality Requirements
Manufacturers need to understand how the finished parts will be evaluated.
If your project has specific inspection or documentation requirements, include them in the RFQ rather than discussing them only after the quotation has been issued.
Depending on the project, you may need to specify:
- Dimensional inspection reports
- First Article Inspection (FAI)
- Material certificates
- Certificates of Conformity (CoC)
- Surface finish inspection
- Special process documentation
- Material or batch traceability
Not every project requires all these documents. The requirements should match the product, industry, and quality expectations.
If certain dimensions or characteristics are critical, identify them in the drawings and explain any additional inspection requirements.
For regulated industries or projects with formal supplier quality requirements, it is especially important to communicate the applicable quality and documentation expectations early.
6. Include Quantities, Delivery, and Packaging Requirements
A quotation depends on more than the manufacturing process and part dimensions. The required quantity and delivery expectations also affect production planning and cost.
For each part, provide the expected order quantity.
If you need several quantity options, such as prototype quantities and future production volumes, include them in the RFQ. This allows the manufacturer to evaluate different production scenarios.
You should also clarify:
- Whether the project is for prototypes or production.
- Whether multiple batches are expected.
- The target delivery date.
- The delivery destination.
- Any special packaging or labeling requirements.
- Whether parts need to be assembled before shipment.
For example, a project may require an initial prototype batch followed by a larger production order. Sharing this information helps the manufacturer understand both the immediate requirement and potential future demand.
7. Organize Your RFQ Package to Reduce Repeated Communication
Even when all the technical information is available, poor file organization can slow down the quotation process.
A simple and consistent folder structure makes it easier for the manufacturer to review the project.
You can organize your RFQ package as follows:
- 01_3D_CAD: 3D models for all parts.
- 02_2D_Drawings: Engineering drawings in PDF format.
- 03_BOM: Complete Bill of Materials.
- 04_Technical_Requirements: Material, finishing, inspection, and other specifications.
- 05_RFQ_Information: Quantities, delivery requirements, and quotation notes.
Use clear file names that include the part number and revision.
For example:
- PART-001_REV-A.step
- PART-001_REV-A.pdf
- PART-002_REV-B.step
- Project_BOM_REV-A.xlsx
Before sending the package, check that all files are included and that the BOM matches the drawings.
If some information is not yet available, state this clearly instead of leaving the manufacturer to make assumptions.
8. What Should You Send to an OEM Parts Supplier in China?
When contacting a custom manufacturing supplier in China, you do not need to prepare a complicated document package. The most important thing is to provide enough information for the manufacturer to understand your project and evaluate its requirements.
At a minimum, try to include:
- 3D CAD files and 2D engineering drawings.
- A BOM with part numbers and quantities.
- Material and manufacturing process requirements.
- Dimensional tolerances and surface finishing specifications.
- Inspection and quality documentation requirements.
- Target delivery date and shipping destination.
- Any special assembly, packaging, or project requirements.
If you are still at the early development stage, you can send the available drawings and explain which details are not yet finalized.
A manufacturer can review the available information and identify the points that need clarification before the quotation is completed.
Frequently Asked Questions
Can I request a quotation without 2D drawings?
Yes. If 3D CAD files are available, a manufacturer may be able to review the part geometry and provide an initial quotation. However, 2D drawings are important for confirming dimensions, tolerances, and inspection requirements. Missing technical information may need to be clarified before the final quotation.
Do I need a separate RFQ for CNC machining, sheet metal, and injection molding?
Not necessarily. If one manufacturer can support all the required processes, you can submit one RFQ package covering the complete project. Use a clear BOM to identify the manufacturing process and requirements for each part.
What if I am not sure which manufacturing process is suitable?
Provide the part drawings, material requirements, estimated quantity, and intended application. The manufacturer can review the manufacturing requirements and discuss possible process options with you. Any change to the approved design should be reviewed and authorized by your team.
How can I get a more accurate manufacturing quotation?
Provide the latest drawings, a complete BOM, clear material and finishing specifications, required quantities, and inspection expectations. The more complete and consistent the information is, the fewer assumptions the manufacturer needs to make.
Prepare Your RFQ with Marigold Rapid
A well-organized RFQ helps both the buyer and manufacturer start a project with a clearer understanding of the requirements.
Marigold Rapid supports custom manufacturing projects involving CNC machining, sheet metal fabrication, and injection molding. We work with customers on prototype development and low-volume production, with manufacturing and engineering support to review drawings, materials, process requirements, and production feasibility.
If you are looking for an OEM parts supplier in China for a multi-process project, send us your 3D CAD files, 2D drawings, BOM, required quantities, and target delivery date.
Our team can review your RFQ and discuss the manufacturing requirements with you.
Contact Marigold Rapid to discuss your custom manufacturing project.